Build Overhaul Kit
Seal kit, bearing kit, gasket kit, wear rings, shaft sleeve, and inspection checklist.
Best ROI
QR Asset Passport Loaded
PumpAIQ recognized this exact installed pump and loaded the operating profile, service history, AI health score, repair-vs-replace logic, and recommended overhaul action.
PumpAIQ recommends a planned overhaul review before the next shutdown. Repair is preferred over full replacement based on estimated cost, remaining service life, and downtime risk.
Seal kit, bearing kit, gasket kit, wear rings, shaft sleeve, and inspection checklist.
Best ROIPlanned repair kit with lower downtime risk.
4 hr downtimeNew pump, motor, base plate, coupling and install labor.
Higher costExpected extended service after planned overhaul and efficiency review.
Recommended
Service Existing Pump
PumpAIQ identifies the pump, asks the repair goal, then builds the correct overhaul kit, gasket kit, seal kit, bearing kit, wear ring kit, soft parts kit, or complete rebuild BOM.
PumpAIQ will create a clean repair BOM and explain why each component is included.
Engineering Interview
PumpAIQ reads the sentence, detects fluid, flow, head, temperature and goal, then builds the engineering profile live.
Step 1
Fluid selection drives pump type, material compatibility, seal selection and temperature limits.
Step 2
Different pump jobs require different pump families and accessories.
Step 3
Flow is the main capacity requirement for pump sizing.
Step 4
Head describes the pressure the pump must overcome.
Step 5
Temperature affects materials, seals, bearings and safety margins.
Step 6
PumpAIQ optimizes the system for the business goal.
Engineering Intelligence Activated
Flow range, head, efficiency, NPSH, material compatibility, temperature, seal risk and motor horsepower are being evaluated.